- A base-case screen alone can miss an upgrade-study trigger. In GridLens's synthetic DC example, worst base loading is 92.3%; worst single-line-outage loading is 112.4%. Requests use a slack-balanced injection, including loads.
- Ask which branch overloads, under which outage, and what changed from baseline. This thermal screen guides further study; connection approval and AC feasibility remain unresolved. Full breakdown: https://veriprajna.com/demos/power-grid-ai #PowerSystems #GridPlanning #Interconnection